Property listed by NAI Capital, Inc., Mehdi Mostaedi 760-780-4200
± 2.5 acre of unimproved residential land for sale on Choco Rd in Apple Valley APN: 0472-361-10. Zoned Estate Residential (R-E) this site will permit for 1 dwelling unit for every 1 to 2.5 acres. Located just off Stoddard Wells Rd, this site is between two major projects coming to Apple Valley. Immediately south is the future site of the Love’s Travel Center and adjoining Bell Mt. Commerce Center, a hub of 2.4 million sq ft of distribution space. To the north, Brightline West’s Victor Valley Station and Maintenance Grounds for the high-speed rail, set to begin heavy construction in late 2025. Brightline West will connect Rancho Cucamonga to the Las Vegas Strip with two stops in the High Desert. Reaching top speeds of more that 200 mph, the high-speed rail will transport passengers across the Mojave Desert in approximately 2 hours with an abundance of amenities while eliminating more than 325,000 tons of carbon dioxide each year with a zero emission train. This project is expected create more than 35,000 jobs through it’s construction period with more than 1,000 permanent jobs. Buyer to verify all information contained herein. Agent and their representatives are not responsible for the accuracy of these claims.
± 2.5 acre of unimproved residential land for sale on Choco Rd in Apple Valley APN: 0472-361-10. Zoned Estate Residential (R-E) this site will permit for 1 dwelling unit for every 1 to 2.5 acres. Located just off Stoddard Wells Rd, this site is between two major projects coming to Apple Valley. Immediately south is the future site of the Love’s Travel Center and adjoining Bell Mt. Commerce Center, a hub of 2.4 million sq ft of distribution space. To the north, Brightline West’s Victor Valley Station and Maintenance Grounds for the high-speed rail, set to begin heavy construction in late 2025. Brightline West will connect Rancho Cucamonga to the Las Vegas Strip with two stops in the High Desert. Reaching top speeds of more that 200 mph, the high-speed rail will transport passengers across the Mojave Desert in approximately 2 hours with an abundance of amenities while eliminating more than 325,000 tons of carbon dioxide each year with a zero emission train. This project is expected create more than 35,000 jobs through it’s construction period with more than 1,000 permanent jobs. Buyer to verify all information contained herein. Agent and their representatives are not responsible for the accuracy of these claims.
Land
Other
--
--
--
2.5
Active
27
-- Sq. Ft.
108,900 Sq. Ft.
Mehdi Mostaedi
NAI Capital, Inc.
San Bernardino
HD25067276
Based on information from California Regional Multiple Listing Service, Inc. as of 04/23/2025 09:32 PM and/or other sources. All data, including all measurements and calculations of area, is obtained from various sources and has not been, and will not be, verified by broker or MLS. All information should be independently reviewed and verified for accuracy. Properties may or may not be listed by the office/agent presenting the information.
Listing Information © 2025 California Regional MLS. All Rights Reserved.
MLS Search Powered by Home Junction.
Sunita Gurung Easterday, CALDRE 01975888, Realoq Inc., CALDRE 02221797, 877-798-2005, 2001 Clayton Road Suite 200, Concord, CA 94520